Roof replacement and rain: ask for the dry-in plan
Before roof replacement begins, ask how the contractor plans for changing weather and protects areas opened during the work. Clarify the amount of roof removed at a time, overnight protection and the response to unexpected rain. A forecast is a planning input, not a guarantee.
On this page
Ask about protection before the first tear-off
The contractor should explain the sequence for your roof and crew. Ask what conditions would delay starting or cause work to pause. Don't pressure the crew to proceed just because materials or a dumpster have arrived.
Different underlayments have different installation and exposure limits. GAF's synthetic roof-deck protection bulletin warns against treating underlayment as a temporary roof. Ask about the exact protection system rather than accepting a generic “it's dried in.”
Put the weather questions on one sheet
| Question | What to establish |
|---|---|
| Start decision | Who checks conditions and confirms the start? |
| Daily sequence | How open areas are limited and protected |
| Overnight condition | What is complete and what remains temporary |
| Unexpected rain | Who responds and what precautions are planned |
| Interior concern | A contact and reporting process for water entry |
| Delay | How schedule changes are communicated |
The plan should reflect the roof's complexity, penetrations and known repairs. A simple roof and a roof with multiple transitions may need different sequencing.
Keep temporary protection distinct from completion
Ask what work remains after the roof is protected: shingles, flashings, accessories or inspections. A protected work stage isn't necessarily the finished assembly or the start of every warranty obligation.
If water appears inside, keep clear of electrical and ceiling hazards, document the location safely and contact the responsible contractor promptly. Emergency conditions need an appropriate emergency response rather than an ordinary online form.
Include weather in the closeout record
Ask how any exposure, temporary repairs or affected materials were assessed before work continued. Keep the final scope, product information and relevant photographs together.