First, record what is happening now
Photograph new drips, wet surfaces, or a growing stain from a safe place. Include a wider view that identifies the room. Write down the date, time, rain conditions, and whether the symptom is in the same location as the original problem.
Keep people away from sagging ceilings and water near electrical equipment. If there is an immediate electrical or structural hazard, seek appropriate emergency help. Avoid climbing onto wet roofing or disturbing materials before the contractor can review the condition.
Tell an old stain from a new observation
A stain left from an earlier leak can remain after the entry point is repaired. New moisture, a changing outline, or a drip is different evidence from an unchanged dry mark. Record what you can observe without declaring a cause.
If you are unsure, tell the contractor exactly that. “The old mark looks darker after rain, but I haven’t seen a drip” is more useful than a confident diagnosis based only on appearance. Do not repaint immediately if the location is still being assessed.
Send a concise callback request
Use this outline for your own message to the installer:
The roof work at [property] was completed on [date]. On [date and time], I observed [dripping, new moisture, or changed staining] in [room and location] during [weather]. This is [the same location as before / a new location]. Please arrange an inspection and confirm what information you need. I have attached a room photo, a close-up, and the relevant scope.
Keep the communication and any response with your project records. Use the contact method stated in your agreement or warranty. An inspection request is more useful when it identifies the observable problem and asks for a next step.
Which details need to be checked?
A roof covering is part of a larger water-shedding assembly. Ask the contractor to evaluate the source and explain how the inspection distinguishes roofing from adjoining walls, chimney surfaces, skylights, gutters, plumbing, or condensation where relevant.
Review the contract boundary as well. Did the project include the chimney flashing, a low-slope addition, or a particular wall transition? Was any existing component retained? Exclusions help define the conversation, but they do not by themselves diagnose where water enters.
Use a callback checklist
- Before the visit: Collect the estimate, approved changes, warranty documents, and symptom photos.
- During the explanation: Ask what was observed, which source is suspected, and what remains uncertain.
- Before work: Ask what will be repaired and whether any charge or warranty process applies.
- After work: Keep the work record and note what happens during later rain.
Does a new roof guarantee that every leak is covered?
Coverage depends on the actual warranty, the source of the leak, and the work performed. A product warranty and a contractor’s workmanship commitment may address different things. Read the documents before assuming that a phrase such as “lifetime” settles the question.
Ask who handles the claim or callback and what evidence they require. A manufacturer’s name on the shingles does not mean the manufacturer installed the roof or covers every cause of water entry. This guide does not determine coverage or responsibility.
When should I seek another inspection?
If the source remains unexplained or the symptom repeats, an additional assessment can help document the condition. Tell the inspecting contractor what work was done and what the installer has already checked. Before another company alters the roof, review how that could affect an existing warranty or the installer’s opportunity to inspect.
For a North Indy home, request an inspection and say that the roof was recently replaced. North Indy Roof Co. performs roofing services directly; share the existing scope so the inspection starts with the right context.
Background: GAF’s roof-leak guidance. The callback template is a documentation aid, not a finding about installation quality or warranty coverage.